So my engineer somehow did not realize we were utilizing 4.1.  He did the entire project calculations based on version 4.  We submitted for design review and of course we got dinged on the incorrect modeling standards.

Does anyone have any experience swapping an already submitted project from one version of LEED to another?  Going from a submitted 4.1 to 4.  Can we change mid stream, post design submittal, or would we need to start from scratch.

Thanks

AAron