LEED Interpretation 10416 allows projects to use later versions of ASHRAE 62.1, such as 2019 and 2022. Starting in 2019, there is a Simplified Procedure for calculating System Ventilation Efficiency (Ev). However, the current version of the LEED calculator (v2009v4v4 1_Minimum_IAQ_Performance_Calculator_v05.xlsm) doesn't support this, as it only uses 62.1-2010 for v4 projects or 62.1-2016 for v4.1 projects. Should I provide my own spreadsheet if I want to use a different version of 62.1?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.