Does anyone have experience with the credit minimum energy performance for a data center certified according to Core and Shell? In the baseline model, created automatically by DesignBuilder there are 8760 unmet load hours in the white spaces with very high internal heat gains. System 8 is used. Is it possible that this system is not able to provide enough cooling because it is not meant for data center purposes or does this mean that the baseline is just incorrect?