Dear all,
I am submitting a Two Stage LEED Assessment and I am not sure how to deal with credits such as The Site Waste Management Plan. Should I leave these construction related credits for now and inform the client of the anticipated score providing our advice is followed? Or should we attempt to provide information for these construction credits alongside the Design Stage submission?
Thanks.
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
June 21, 2012 - 12:56 pm
Chris, in a split submittal, MRc2 is part of the construction-phase submittal, and would be expected to be deferred till then. (This phase information is in the Doc Toolkit above, by the way.)