Hi,

We are working on a project with an occupancy of 1,500 people. According to the reference guide, at least 250 surveys should be done to get a score.

Is there an specific period to report the surveys? (Different from the LEED O+M Reference Guide, where it should be conducted everyday for a week). 

Thanks