Forum discussion

CS-2009 SSc7.1:Heat Island Effect—Nonroof

SS 7.1 and Inovation in Design

My project has 100% of the parking located in a garage under the building. What is the process for claiming an ID point for this credit? I am unfamiliar with the term "Credit Assembler" that I was told I needed to use for Construction Credit.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 11/05/2013 - 15:34

I am also not sure what you mean by "Credit Assembler". If you fill out the LEED online template for SSc7.1 at the bottom of the template, it will indicate whether or not you have achieve exemplary performance on the credit.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.