EBOM-v4 EAp3:Building-level energy metering

Shared energy metering with USGBC

In connection with EAp3 it is required to share the metered energy use of the building with US-GBC during the first 5 years.

In this connection I would like to know, if the energy consumption needs to be on "system-level" or it is acceptable it is the total energy use for electricity, heating and water. And ofcause the electricity production of solar energy and wind energy. 

This means in total about 30 numbers per year (about 5 numbers per month).

 