Hello.

We are facing an issue while attempting to Skip Final Construction Review. We understand that all pending credits have to be withdrawn in order to skip review and we have managed to do that for 2 out of 3 pending credits.The problem is that in LEED v4 Innovation category, all credits are included in one credit on LEED Online. In this category, we have already been awarded 4 points and 1 pending, which we would like to withdraw. The problem is when we attempt to withdraw it, we are losing all 4 awarded points. We have tried changing the threshold from 5 to 4 points, and removing the credit from the form but it is still showing as pending. 

Kindly advise,