NC-v4 WEp3:Building-level water metering

Potable water use measurement - 1 meter or several meters?

Hi,

in order to comply with building-level water meter requirements, is it acceptable to use several water meters, as long as they guarantee the measurement of 100% of potable water use, OR is it mandatory to measure 100% of potable water use using only a single water meter?

Regards, 

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 04/12/2019 - 00:21

Hi Ricardo, you can have more than 1 meter. Check out Step 3 in the Step-by-Step Guidance section of the Reference Guide.