Hello,

RE: IEQ Credit 5 - Indoor Chemical & Pollutant Source Control

We are dealing with a project that seeks to obtain the credit above.

The design team is willing to specify a permanent entryway system for all regularly used entrances, but faces a space issue, as the entrance door is right on the public sidewalks, and the lobby room depth (i.e. from entrance door to elevators) is less than 10 feet. Therefore the permanent entryway system cannot be 10 feet long.

Did any of you encounter such an issue before ? Do you think that the USGBC will accept a permanent entryway system less than 10 feet given the circumstances ?

Many thanks for your feedback