Our healthcare project is a new build, and will specify all LED light fixtures. No fixtures contain mercury. To meet the requirements for the PBT Source Reduction prerequisite and ccredit, are we still required to upload the PBT source reduction calculator, and if so how would this document be compiled as none of the lamp type options apply?