Our project has been collecting documentation for this credit for some time with Option 1 before Option 2 addendum became available. We still have not completed the percentage required to secure this credit but are nearly there. We have a large cost product coming in outside the 500 mile (800 km) radius (due to ship travel) but if we use Option 2 for this product with the weighted calculation we can fulfill the requirements from Option 2.

Can we use Option 2 for this product even though we have previous documentation for Option 1? As we do not want to redue documentation at this point in the game.

thanks