Can the water meter installed to measure the monthly and total building level water (WEPR2) be used to determine the anual Option 2 metered water use baseline (WEPR1 option2) if there is no more potable water uses? If there are more uses the WEPR1 option2 requires water meters for submetering all the fixture and fittng water circuits, isn´t it?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.