Hi users, In general, For energy simulation, we modeling the tenant occupied spaces on an Office building (Commercial interior) by comparing our proposed case (project building )with our baseline case (ASHRAE 90.1) . In this project we had a water cooled chiller as a builder scope. The project building only purchasing the chilled water from the builder side. In this case , I go with an option of purchased chilled water means how do I consider the pumping, fan power and some related consumptions. Please give me a suggestions to my query.
0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 10/03/2023 - 17:21

This is covered in detail in the Reference Guide. There are two methods - if the project has similar occupancies throughout then you proportion the system by area; if the occupancies are dissimilar it gets a bit more involved but it is distributed based on the portion of the overall loads in your space. 

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.