In the Design Submittal, I uploaded a letter from the local transit authority that two bus routes were planned and funded; however, they were not operational because the employees had not moved to the new plant. In the Technical Advice, the Reviewer wrote that the routes had to be operational or a private shuttle could be provided until the two planned public routes are operational. Since employees will not be at the facility, it doesn't make sense to fund a shuttle that will not be used. Is it possible to withdraw this credit SSc4.1 now and resubmit in the Construction submittal at a later date?