Is there an opportunity to utilize a different baseline on an existing building that is fully electric building in lieu of the directed (which is gas)? In addition, for LEEDv4.1, is it appropriate to include PVs as part of the minimum energy performance threshold calculations?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5907 thumbs up
October 16, 2020 - 12:52 pm
You have to use the 90.1 baseline systems.
As I understand it the building must meet the minimum requirements without renewables.