GIven that the requirement for Open Space is that it is to be "dedicated" over the life of the building, I'm having trouble deciding which plan (current, or master) to use for the SSc5.2 section. Under SSc9 we are required to show open space on a master plan basis, which includes additional building etc. on areas we would have originally counted as open space without master planning. Now that we have done master planning, those spaced are no longer "dedicated" open space. Shouldn't we use the master plan building footprint for the calculation of SSc5,2 now that we know of this potential future development? This would result in open space quantites for SSc5.2 and SSc9 to be the same.