We registered a project in 2009 as a single building prior to the publications of campus/multi-building application guide even through it is three buildings. The project has come back and we found out the fees have tripled to re-register now as a Group Certification and some credits will be much more stringent now that each building must stand alone on the IEQ credits. Is there a president to "grandfather" the project in as it was registered in 2009 prior to the publication of the campus/multi-building process.