I modeled a baseline model with System 7. The reviewers wrote that in Tab. 1.4 insufficient information was provided about the VAV reheat boxes, in particular as for G3.1.3.13. I'm using Revised Section 1 4 Tables (Jan 2014).
How could I show that the model respects paragraph G3.1.3.13?
Best Regards