Hi

The Innovation Catalog shows two precedents of Exterior Envelope Commissioning, one approved and one denied. I cannot see any distinguishing characteristic that would show why one met it and the other did not.

We're considering commissioning the exterior per the language in LEED v4 Commissioning prerequisite:

Requirements for exterior enclosures are limited to inclusion in the owner’s project requirements (OPR) and basis of design (BOD), as well as the review of the OPR, BOD and project design. NIBS Guideline 3-2006 for Exterior Enclosures provides additional guidance.

Does anyone have experience with this approach and getting it approved?

Thanks Eric