I am wondering how to handle an existing chiller in a LEED C&S project.
The building of the C&S project got 100% refurbishment for the building constructions.
The central chiller plant has been reused from the old building.
Can the existing air cooled chiller be used as chiller in the baseline model or do I have to use the water cooled chiller from ASHRAE table.
Thanks for your help.