I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the facility is for the industrial process itself. My question is: can I model this project considering the industrial process loads as a receptacle loads which will be identical in the baseline and proposed building cases?