Hi all,
We are undertaking the energy modeling of an office building and the Baseline is using a System 7, climatic zone is 4a. The building is connected to a heating District Energy System.
Could someone please help me to understand ASHRAE 90.1 §G3.1.2.4? The section states, “Supply and return fans shall operate continuously whenever
spaces are occupied and shall be cycled to meet heating and cooling loads during unoccupied hours. If the supply fan is modeled as cycling and fan energy is included in the energy-efficiency rating of the equipment, fan energy shall not be modeled explicitly.”
In our case, the supply fan is modeled as the cycling fan. I cannot see how the supply fan should be modeled without taking into account its energy consumption. Should the extract fan be cycled too?
Thanks for your help.