Topic | Recent |
---|---|
Unclear sound isolation requirements at hallwaysPilot-Credits EQpc24: Acousticsposted by Matthew Azevedo on Dec 2, 2013, 4:03 pm
The documentation requires a composite... Last reply: Larissa Oaks, Jan 31, 2014, 11:09 am |
|
weighted sound reduction index VS STCPilot-Credits EQpc24: Acousticsposted by Ian McCall on Jan 21, 2014, 10:40 am
Hi, This credit require to evaluate the sound isolation performance of constructions using... Last reply: Larissa Oaks, Jan 31, 2014, 10:31 am |
|
MeasurementsPilot-Credits EQpc24: Acousticsposted by Anulak Siwabut on Jul 1, 2013, 11:29 am
I don't see specified in the documentation the extent of measurements required in order to meet this credit. Is it possible to measure a typical of each room type or do all spaces need to... Last reply: Larissa Oaks, Nov 25, 2013, 1:13 pm |
|
sound reinforcement and masking systems required?Pilot-Credits EQpc24: Acousticsposted by Emmanuel Pauwels on Dec 18, 2012, 2:21 pm
It is correct that sound reinforcement systems are only required fro conference rooms or auditoriums for more then 50 people? Last reply: Larissa Oaks, Nov 25, 2013, 1:09 pm |
|
Challenges logging into forumPilot-Credits EQpc24: Acousticsposted by Deborah Lucking on Sep 25, 2013, 1:47 pm
We just registered for this Credit - called EQpc24 - in the USGBC Pilot Credit Library for LEED 2009 . It was impossible logging into the forum from that webpage. |
|
Above and BeyondPilot-Credits EQpc24: Acousticsposted by Dan LeBlanc on Aug 8, 2011, 2:55 pm
Is this ID credit approach asking for an effort substantially above and beyond the enhanced credit for LEED for Schools? Not being an acoustics engineer, it seems there is a dizzying amount of... Last reply: Deborah Lucking, Sep 25, 2013, 1:04 pm |
|
implementation costs (soft costs)Pilot-Credits EQpc24: Acousticsposted by Emmanuel Pauwels on Dec 12, 2012, 2:57 pm
We are considering this credit for a New Construction Project. Before making a decision we need to estimate the engineering cost involved for this credit. Last reply: Helen Kessler, Feb 28, 2013, 5:01 pm |
|
Design or Construction Credit?Pilot-Credits EQpc24: Acousticsposted by Orlin Velinov, PE on Mar 2, 2012, 12:43 pm
Is this s design or construction credit? From the credit form requirements looks like the NC levels will have to be measured, the rest criteria can be theoretically analysed or modeled. We are at... Last reply: Nicholas Block, Mar 2, 2012, 2:45 pm |
|
Speech privacyPilot-Credits EQpc24: Acousticsposted by James Chueh on Jan 9, 2012, 4:50 am
Hi all, Last reply: Orlin Velinov, PE, Mar 2, 2012, 11:42 am |