After filling the sample form table IEQp1-4 and press calculate I get a Y (yes) in both compliance with IEQ prerequisite 1 and credit 2. However, the cell below which links to IEQc2 sample form still shows a N (No). I have filled the mechanical ventilation section with all the AHUs and rooms. Also the table IEQp1-A4 shows compliance with prerequisite and credit 2.
Could anyone advise on what could be the problem for not having the linked cell properly changed to Y (Yes)?
Andrew Mitchell, P.E.
PrincipalMitchell Gulledge Engineering, Inc.
LEEDuser Expert
126 thumbs up
February 2, 2017 - 10:51 am
Without actually logging in and seeing what is happening, it is almost impossible to determine what the issue is. In the past I have use the alternative compliance field to indicate that all requirements were met, but that the form still indicated NO. That has worked for me.