Our project is a student dorm on a university campus. The campus generates most of its power with their chilled water and co-generation plants and they purchase very little energy from the local utility. The Student Housing department will pay utility bills to the campus for energy use so there is an incentive for them to develop a load shedding strategy. In addition, the Central Plan is at max capacity so load shedding would also benefit the overall campus. Can our project pursue this credit, basically treating the campus central plant as the utility?