I have similar concerns as Maria described earlier, and I would really appreciate some advice on how to calculate material costs in a case where a sub-contractor is performing concrete works on-site with a lump sum compensation policy, i.e. costs of labour, material, equipment and transportation are all invoiced with one sum.

The problem here is how I should determine the material costs of the concreting works. And if I understood correctly the 0.45 default multiplier can only be used for determining the total material costs of the project, so using this method is not eligable for calculating material costs in a separate sub-contract.

How can I proceed in determining the material costs for the on-site concrete works, when the sub-contractor is not able to specify material costs of the works? Any advice is much appreciated!