Forum discussion

CI-v4 MRc5:Building product disclosure and optimization - material ingredients

BPDO Material Ingredients: required to report material cost if pursuing Option 1?

Hello, if we are pursuing option 1 for MRc5 (20 compliant products from at least 5 manufacturers), are we required to report the cost of each material? I have this same question for the EPD credit as well.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 09/02/2022 - 14:06

Adam You don't need the cost for the BPDO calculator to earn EPD or MIR credits. However, I'm guessing you'll have a lot of overlap with those products and low-emitting, where you may need the actual costs if something isn't compliant.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.