In the building we are modeling 3 tyes pf glass (3 different U values and SC) are used by the architect.Is it acceptable for EAP2 that I do the following:
1-Use % or glass on each elevation provided by the acrhitect( i am iusing equest) and i think this is easiest solution than adding manually each glass because the pattern is very cmoplicated...how is the leed review is going to check the glass distribution ( which report he will ask to be provided?)
2-In the baseline i Took the total percentage of glass provided by the achitect and I assumed it is a single glass so i can have same distribution in the baseline.
regards,