Log in
LEED v4
Existing Data Centers
Regional Priority
Regional priority

LEED CREDIT

Data-Centers-EBOM-v4 RPc1: Regional Priority 1-4 points

See all forum discussions about this credit »

SPECIAL REPORT

LEEDuser expert

Tristan Roberts

LEED AP BD+C, LFA

Vermont House of Representatives
Representative

SPECIAL REPORT

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Earn up to four of the six Regional Priority credits. These credits have been identified by the USGBC regional councils and chapters as having additional regional importance for the project’s region. A database of Regional Priority credits and their geographic applicability is available on the USGBC website, www.usgbc.org/rpc. One point is awarded for each Regional Priority credit achieved, up to a maximum of four.

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Frequently asked questions

What about international projects?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Where can I learn more about how RP credit zones for LEEDv4 projects were determined?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

How do the thresholds work?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

LEEDuser expert

Tristan Roberts

LEED AP BD+C, LFA

Vermont House of Representatives
Representative

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Earn up to four of the six Regional Priority credits. These credits have been identified by the USGBC regional councils and chapters as having additional regional importance for the project’s region. A database of Regional Priority credits and their geographic applicability is available on the USGBC website, www.usgbc.org/rpc. One point is awarded for each Regional Priority credit achieved, up to a maximum of four.

What about international projects?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Where can I learn more about how RP credit zones for LEEDv4 projects were determined?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

How do the thresholds work?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

LEEDuser expert

Tristan Roberts

LEED AP BD+C, LFA

Vermont House of Representatives
Representative

See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Data-Centers-EBOM-v4 RPc1