The first year of operations is usually a learning period for both the occupants and the facility manager. If your project underwent enhanced commissioning and developed an operations manual, you will have fewer miscommunications and untrained staff.
Make sure mechanical spaces and locations are coordinated in the architectural and structural drawings. For example, is a duct run colliding with a beam? Is a fan coil unit placed above a door opening so that it will leak condensate on people walking into the space? Common mistakes like this can cause construction delays and poor performance during operations if not detected, so coordination of the drawings is critical, especially if your project involves integrated design and complex systems.
Energy systems are only as efficient as they are well-installed and operated—involve the operations team during the final Construction Documents phase (or even much earlier) to make sure they are abreast of design decisions and prepared to operate in the sequence required.
Use your energy model to review envelope thermal and hygrothermal performance. In a heating climate, thick insulation inside the air barrier may cause condensation problems. Consider an exterior thermal barrier to protect the air barrier and to prevent condensation inside the wall cavity. Identify thermal bridges in the walls and windows that could leak heat from inside. Add thermal breaks, such as neoprene gaskets, on shelf angles, silicone beading on window frames, and use other techniques to prevent leakage from the envelope.
By this stage, the architect should have seen a visual presentation by the energy modeler on multiple building forms with energy-use comparisons. This will help hone in on the most energy-efficient design that also supports the building program.
Daylighting makes for welcoming spaces, and can save energy both through reduced electric lighting and reduced cooling load due to the reduced electric lighting. Consider an atrium and skylights to serve ventilation and light functions. Integrate spatial programming within the atrium to utilize the space. See LEEDuser’s daylighting strategy for more.
Up to three LEED points are available under Option 3 for compliance with the Core Performance Guide. It’s a good option if your project is smaller than 100,000 ft2, does not fall into one of the Option 2 categories and you’d rather not commit to energy modeling (Option 1). Your project automatically earns one point for meeting the prerequisite. An additional one or two points are available for meeting any three or six requirements, respectively, of Section 3.