Consider including questions that address issues outside of ASHRAE 55-2004, such as acoustics, lighting and other comfort or productivity issues. The survey process is a great opportunity to measure building performance beyond ASHRAE 55-2004 and thermal comfort.
A plan for corrective action should include system inspection to confirm proper operation, adjustment of set points, change in operating schedule, increasing air volumes, and other basic HVAC management measures.
If the commissioning agent or MEP is developing the plan for corrective action, make sure that the owner and O&M staff review and understand it so they can implement it if needed.
Survey participants must remain anonymous, but ideally they should provide information on their location. For example, you may want them to indicate on which floor and directional face (north, south, east, west) of the building they are located (or wing or program area). Doing so helps to better identify problem areas.
Using a comprehensive Occupant Indoor Environmental Quality (IEQ) Survey service like the one from UC Berkeley offers you the possibility of gleaning useful information on many other aspects of your indoor environment beyond thermal comfort. You can also customize it to learn occupant responses to specific features of your building. And getting your results mapped alongside others is very useful.
Develop the thermal comfort survey after determining space programming, designing the mechanical system, and confirming compliance with IEQc7.1. It is best to customize the occupant survey for the building’s planned HVAC systems. Questions may be structured differently depending on whether you are assessing the performance of an evaporative cooling system, an in-floor radiant heating system, or a natural ventilation system.
The building management team should review all practices and products prior to contract renewal with cleaning service providers (typically annually) to identify opportunities for improvement and expansion of environmentally friendly practices.
Although many elements of green cleaning policies and programs are directly transferable between projects, the expectation is that they will be building-specific—don’t expect to simply cut and paste from another project submission or have a vendor deliver a complete documentation package.