Use temporary ventilation systems instead of the permanent HVAC units during construction. This prevents contamination of new ductwork during the construction process.
Develop documentation customized for LEED submission—complete with LEED-related notes, callouts, and details—concurrently with the finalized construction documents.
Determine the type of entryway system that's best for your project. If you install permanent grates, grilles, or slotted entry systems, you will not be required to have a plan for cleaning, although those systems will still need periodic cleaning (less frequently than roll-off mats). However, if you decide to use rollout mats, you'll need to have a contract in place for weekly cleaning. The contract for weekly cleaning can be incorporated into any existing contract but must be clearly spelled out.
Refrigerants are not harmful to the environment until they are released into it. That’s most likely to occur during installation, maintenance, and removal. Hire a contractor that uses best-practice refrigerant management techniques to minimize leakage rates during operations and when installing new or removing old equipment.