Protect HVAC equipment from dust and odors during construction.
According to the LEED definition of facility alterations and additions, implementation of the IAQ management plan is required for construction that:
Develop a plan to perform the ventilation flush-out of impacted areas prior to occupancy.
If 20% or more of survey respondents are dissatisfied with their thermal comfort, implement the plan for corrective action.
Compile survey results and review them to identify trends that reflect good or poor system performance.
Conduct the survey after 6–18 months of occupancy. Survey all building occupants, including students in grades 6–12, teachers, and staff.
Conduct the survey after 6–18 months of occupancy. Survey all regular building occupants, including employees, staff, and other building users.
Verify proper installation and commissioning of the building monitoring system.
Include specifications for O&M and the plan for corrective action.