After completion of all construction activities, document credit compliance in LEED Online by uploading these documents:
Provide corrective actions immediately after any rain event.
The general contractor implements the ESC plan until construction is completed and all disturbed areas have been stabilized.
Verify that all ESC measures are in place before any construction activities begin.
Review all ESC project drawings and construction specifications prior to construction activities.
Finalize your ESC plan drawings or narrative report. Verify that your plan is in compliance with the
A project drawing should include anticipated stormwater flows and indicate the location and type of any planned ESC measures.
Make sure that you use the same LEED project boundary as all other LEED credits your project is attempting (this is particularly relevant with other Sustainable Sites credits).
Create a draft ESC plan drawing or a narrative report that outlines how your project will comply with the requirements of the
Review your ESC and stormwater pollution prevention plans to ensure adequate measures will be implemented to meet the