Action Steps

Determine predicted savings based on the final design estimate minus the baseline case. Calculate as monthly cost savings for the whole building or space, or by system. During this process, try to account for any varying factors that could affect the fina

Determine predicted savings based on the final design estimate minus the baseline case. Calculate as monthly cost savings for the whole building or space, or by system. During this process, try to account for any varying factors that could affect the final design and baseline cases. These could include anything from weather patterns to occupancy levels.  

Verify that process water is being submetered. Process water is the only water that needs to be submetered. Process water includes water used for cooling, heating, and domestic hot water. Water for tenant uses such as restrooms, janitorial purposes, and b

Verify that process water is being submetered, along with lighting, plug loads, heating and cooling. Process water is the only water that needs to be submetered, water for restrooms, kitchens, and janitorial rooms doesn’t need to be submetered. Process water is the only water that needs to be submetered. Process water includes water used for cooling, heating, and domestic hot water. Water for tenant uses such as restrooms, janitorial purposes, and break rooms does not need to be submetered. 

The M&V provider should work with the MEP to verify that all mechanical and electrical systems have the capability, and are designed, to allow metering and submetering. In addition, these systems must be designed to properly interface with any BMS or

The M&V provider should work with the MEP to verify that all mechanical and electrical systems have the capability, and are designed, to allow metering and submetering. In addition, these systems must be designed to properly interface with any BMS or submetering installed. The M&V provider can verify that the M&V systems installed are capable of providing the information required for the credit.