The general contractor (GC) should be oriented to all LEED-related issues, including
Make sure low-emitting requirements have been integrated in construction specifications. Products must be at or below the recommended
First check the allowable
VOC adhesives benefit both the project and construction workers.
Upload to LEED Online a copy of the building’s ongoing commissioning plan, along with documentation summarizing the overall
Document the deficiencies uncovered and corrective actions taken for commissioning tasks performed during the performance period.
Update the building operating plan based on any changes that are made as a part of the ongoing commissioning activities.
Conduct at least half of the first commissioning cycle within two years of the LEED certification application.
Make a list of all building equipment relevant to the commissioning process. Note how frequently each item should be tested and include procedures for responding to deviations from the expected performance parameters.
Establish procedures for responding to deviations from the expected or preferred performance parameters.