Further develop energy optimization strategies with the design team. Look at reducing loads while creating a comfortable environment within the shell. Look at reducing east and west exposures, and at providing south windows with exterior shades to make a design feature out of passive techniques. Discuss highly efficient system design at this stage, before your design is finalized—for example:
If you are installing a renewable energy system that provides at least 5% of your electricity, you already implemented one of the three strategies from the Core Performance Guide.
Review Section 3 of the Core Performance Guide to identify three or six of the 11 available strategies (for one or two points, respectively) to pursue.
If you complete the documentation for EAp2, Option 3, you earn one point through EAc1, Option 3. The requirements are identical with EAp2 and requires minimal additional time on the part of your engineer.
If you complete the documentation for EAp2, Option 2, you automatically earn a point through EAc1. The requirements are identical to EAp2 and require minimum additional time on the part of your engineer.
If your building includes the use of purchased steam supplied to your HVAC system, the proposed (design) building is modeled as if the steam system is “located” in the building— with the same efficiency with which it typically operates. The designed building is allocated only the fuel cost (for natural gas or oil) required to generate and deliver the steam needed for the building. The steam purchased is actually considered “free,” as steam rates are not included.
Consider highly efficient systems like heat pumps for heating and cooling, district energy and cogeneration, ice storage for off-peak cooling, or energy recovery ventilation—to attain a substantial energy reduction of 10%-20%.
Your mechanical engineer and energy modeler need to work in collaboration with the architect when finalizing building form, façade treatment, and programming—to give real-time input on the energy impact of all the design features.
Follow the guidelines on identifying energy-efficiency strategies to achieve the owner’s energy efficiency goals per the Owner’s Project Requirements, developed for EAp1: Fundamental Commissioning.