Use this checklist for mechanical systems prior to construction to check prerequisite compliance:

  • Using the mechanical equipment schedule, confirm that outside air is being supplied to mechanically ventilated spaces.
  • Do you have calculations showing the outside air required by ASHRAE 62.1-2007 for mechanically ventilated spaces separate from naturally ventilated spaces?
  • Do outside air rates meet or exceed the calculated ASHRAE minimums?
  • Are all regularly occupied spaces listed in the ASHRAE calculations?
  • What is the desired MERV filtration? If using a high level of ventilation to meet EQc5, has the mechanical system been sized accordingly?