Upfront costs for commissioning are likely to be greater than those for the ASHRAE Level II Audit. However, the additional testing involved in commissioning can lead to additional long-term operational savings beyond those generated by the ASHRAE Level II Audit.
Credits:
Project phase:
Credit tip type: