Update the checklist assembled during schematic design to confirm that the project is still on track with 50% of reused interior elements for LEED compliance. For example, a wall initially assumed to be in good condition may be found to be in poor condition, and needs to be replaced with new materials. The checklist will help track credit compliance throughout the design and construction process.