Schedule the application of adhesives and sealants so that offgassing does not contaminate other absorptive materials. This is required if projects are attempting EQc3.1: Construction Indoor Air Quality Plan—During Construction. For example, do not store or install acoustic ceiling tile before flooring and wall adhesives are put down, because ceiling tiles will absorb the off-gassing of paint and floor adhesives and contaminate the air over a longer time period.