Require that your contractor submit an IAQ Management Plan early in construction, before interior work has begun. The plan should detail the approach to this credit, as well as EQc3.1 if both credits are being pursued. Either of these credits can be pursu

Require that your contractor submit an IAQ Management Plan early in construction, before interior work has begun. The plan should detail the approach to this credit, as well as EQc3.1 if both credits are being pursued. Either of these credits can be pursued independently; EQc3.1 is not a prerequisite for EQc3.2. However, pursuing the credits in tandem is the most effective way to ensure the best IAQ at the time the building is turned over to the owner. 