Log in

Model development should be carried out following the PRM from ASHRAE 90.1-2004, Appendix G, and the LEED 2009 Design and Construction Reference Guide, Table in EAc1. In case of a conflict between ASHRAE and LEED guidelines, follow LEED.

Model development should be carried out following the PRM from ASHRAE 90.1-2004, Appendix G, and the LEED 2009 Design and Construction Reference Guide, Table in EAc1. In case of a conflict between ASHRAE and LEED guidelines, follow LEED.

Credits: 
Project phase: 
Credit tip type: