Since IEQc3.1, a LEED construction phase submittal has to be achieved before a project can be approved for this credit, don’t bother to submit IEQc10 until the LEED construction submittal. This does not mean that you should hold off until after design to

Since IEQc3.1, a LEED construction phase submittal has to be achieved before a project can be approved for this credit, don’t bother to submit IEQc10 until the LEED construction submittal. This does not mean that you should hold off until after design to plan for achieving this credit, however!