How do you decide whether to use the actual material budget or the default budget as your baseline? The lower you can get the baseline, the easier it is to purchase enough regional material to reach the credit threshold. For example, a project that is renovating an existing building will have low material costs and high labor costs. It might be better for this project to use the actual budget as the 45% default may bring the baseline too high.