A helpful waste management plan should indicate the following:
- the types of waste building materials anticipated from the job
- how much waste building material is anticipated from the job
- possible ways to divert each material, such as sending it to an identified recycling plant, salvage yard, or donation entity—or to reuse the material onsite for new construction
- the method for ongoing tracking and quality control
- methods for separating and measuring waste either on- or off-site.