Log in

Ensure that the water management plan is available to all relevant personnel and is being followed during the performance period.

A narrative describing the conductivity meters, automatic controls, and the setpoints installed on each cooling tower must be included with your documentation. Be sure to include details about specific target concentration rations for each system. A manufacturer cut sheet, photograph, or engineer drawing for each conductivity meter must be supplied as supporting documentation.

Credits: 
Credit tip type: