At the end of construction, the architect revisits the preliminary calculations to confirm that the percentage of reused building elements is above the 50% threshold required for the credit.
Project phase:
Credit tip type:
At the end of construction, the architect revisits the preliminary calculations to confirm that the percentage of reused building elements is above the 50% threshold required for the credit.