EAc5.1 for LEED-CS buildings is similar to the requirements for LEED-NC EAc5, but with an additional emphasis on including information on tenant sub-metering in the M&V plan. However, your project is not required to separately meter each tenant space for EAc5.1. The focus of your M&V plan should be on electricity-using systems in the core-and-shell base building.
Credits:
Project phase:
Credit tip type: